Library: 9008 - Minnesota DOT NTCIP ESS

Document Number: Document Type: Former Doc. Number: Document Status: Published:
9008 Information Report none Recommended Information Report
Developed By: Case Studies Project Team
Point of Contact: NTCIP Coordinator
Published: This Recommended Information Report is available from the link below.
Description of Document:
A case study on the Minnesota DOT Statewide R/WIS Project. The project was for 76 NTCIP ESS installed on an approximate 60-kilometer grid throughout the State of Minnesota. The project scope included bringing about 70 other existing observing stations into the network.

Document Status:

Date submitted: 1/22/2004

In Fiscal Year 2002 -- FHWA funding was received to sponsor the development of five additional case studies, and make three updates to the previous case studies. In October 2001, a project team was selected and started work on the Phase 2 case studies.

In October 2002 -- the Joint Committee on the NTCIP accepted the draft case studies (including 9008) and amendments as Recommended Information Reports.

###

What's Available:

    Technical Paper(s):

      Minnesota DOT Statewide R/WIS Project,
      Date Posted: 11/24/2003 12:24:01 PM
      Document Description: This document discusses the statewide deployment an NTCIP ESS system in Minnesota.

    NTCIP documents are distributed in Adobe® Acrobat® format. Version 9 of the Acrobat Reader® is recommended. To get Adobe® Acrobat Reader®, click here.


Return to NTCIP home page This site last updated August 24, 2010
© 1997-2010 AASHTO, ITE, NEMA. Portions © 1997-2010 Weblynx®.
NTCIP is a Trademark of AASHTO, ITE, NEMA.

This site was developed by Weblynx Corporation under contract with the National Electrical Manufacturers Association.
Information contained within this site may not be reproduced without written approval of
RITA ITS JPO and/or AASHTO and/or ITE and/or NEMA and/or Weblynx.